Thanks for stopping by. Let’s solve your solar foundation challenges.
Nov 17–19 at the Las Vegas Convention Center. Visit The Foam Guys at Booth W15959 to talk pile performance, difficult soils, and remediation options that protect EPC schedules and budgets.

The Sun Moves. Your Piles Shouldn’t.
Solar pile stabilization and foundation remediation designed to keep your construction schedule moving, reduce unnecessary rework, and support long-term solar performance.
Solar
Schedule Protection
Cost Control
Minimal Disruption
Foundation Performance
Real Projects. Real Jobsites. Stronger Foundations.
Discover how targeted pile stabilization and soil improvement help EPC contractors address foundation challenges before they become costly delays.

Solar Project Video
The solution isn’t just stronger soil. It’s a stronger project.
When foundations underperform, schedules and budgets are at risk. Our targeted remediation approach helps address the problem without defaulting to major rework.
01
Protect the Schedule
Rapid-setting injection materials can reach working strength in under three hours, depending on site conditions.
02
Control Costs
Explore in-place remediation before committing to costly pile replacement or foundation redesign.
03
Limit Disruption
Targeted injection can reduce excavation, heavy rework, and interference with surrounding activities.
04
Protect Performance
Support pile stability and array alignment through site-specific foundation solutions.
Solve the Soil. Secure the Schedule.
From engineering and testing to pile remediation, we help EPC teams address foundation issues at every stage of solar construction.

01
Pre-Construction Engineering & Testing

02
Pile Stabilization

03
Void Filling

04
Sunk-Pile Remediation

05
Pre-Drill Pile Securement

06
Remediation Without Array Deconstruction
Foundation challenges don’t have to become project delays.
Our poly-grout injection process uses expanding, hydrophobic polyurethane to fill subsurface voids and stabilize soils around piles. Treatments are developed around site conditions and project requirements.
Inconsistent soils: Address weak or variable soil conditions affecting pile performance.
Failed load tests: Evaluate targeted stabilization for piles that do not meet required resistance.
Settlement and alignment: Improve support in areas affected by soil movement.
Pre-drilled piles: Explore engineered stabilization where pile securement is challenging.

Performance you can measure.
15,000+ LBS
Vertical Pull Capacity
9,500LBS
Lateral Load Capacity
15,000LBS
Compression Capacity
< 3HRS
Reported Working Strength
Illustrative field-test results from The Foam Guys’ RE+ materials; results are not guaranteed for every pile or site. Confirm engineering criteria and supporting test documentation for individual projects.
Our five-step stabilization process.
01
Site Assessment
Review geotechnical conditions and identify treatment areas.
02
Targeted Access
Position injection rods at the planned treatment depth.
03
Poly-Grout Injection
Inject expanding polymer to fill voids and stabilize soil.
04
Cure & Test
Confirm performance through project-required testing.
05
Documentation
Provide injection logs, available test data, and site reporting.

Dedicated crews. National reach.
With nationwide deployment capabilities and up to 12 dedicated crews identified in our event materials, The Foam Guys support utility-scale solar projects across construction phases.
12
Dedicated Crews
Nationwide
Deployment
<3hrs
To Working Strength
Whether you’re planning early soil improvements or responding to a failed pile test, we can help evaluate an efficient path forward.

Pile failure shouldn’t put your project on hold.
Tell us about your site conditions, timeline, and foundation challenges. Let’s discuss a practical remediation approach.

Attending RE+ 2026? Meet our team at Booth W15959
Las Vegas Convention Center · Nov 17–19
Las Vegas Convention Center · Nov 17–19
Florida Certified General Contractor · CGC 1507037
Request a Project Consultation
Or schedule a booth meeting at RE+ — check the box below and we’ll find a time on the show floor.